• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Environmental Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Sulfide Generation in Force Mains and Its Control Using Nitrate Dosing

    Thumbnail
    View/Open
    %28ASCE%29EE.1943-7870.0002016.pdf (2.839Mb)
    Date
    2022/04/28
    Author
    Zhi Yang
    David Z. Zhu
    Tong Yu
    Adam Shypanski
    Stephen Edwini-Bonsu
    Yanchen Liu
    Metadata
    Show full item record
    Abstract
    Sulfide generation rates in the force mains of four pump stations in Edmonton, Alberta, Canada, were evaluated in the field, and a continuous nitrate dosing was applied in the pump wet well of the Big Lake pump station to investigate its effectiveness on sulfide control. The sulfide production rates at these force mains were estimated to be 0.08–0.15  g/m2 h under 20°C, which could be modeled by using the 1/2-order biofilm kinetics of dissolved chemical oxygen demand (DCOD). The modeled rate constant a was obtained at around 0.006 using the field monitoring data. It was found that 20  mg/L sulfide was formed in the force main of the Big Lake pump station, which resulted in 400–500 parts per million (ppm) H2S gas in the discharge manhole. It was found that a nitrate dosing concentration of 85  mg/L could completely suppress the sulfide generation in the force main. A constant dosing rate resulted in nitrate overdosage at midnight and underdosage in peak hours. Injecting nitrate in the wet well led to a large portion of nitrate consumption where a heterotrophic denitrification process happened. The appropriate dosing location for this dosing strategy is at the beginning of force main instead of the wet well. The corresponding dosing rate is a flow-paced dosing rate instead of a constant dosing rate. A more cost-effective dosing strategy is to add the nitrate at downstream section of the force main where sulfide generated upstream could be removed in the presence of nitrate when passing downstream. This dosing strategy could significantly reduce the nitrate demand.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286195
    Collections
    • Journal of Environmental Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV