• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Submodel Comparison Method Based on IFC File Content

    Thumbnail
    View/Open
    %28ASCE%29CP.1943-5487.0001029.pdf (1.894Mb)
    Date
    2022/04/27
    Author
    Xiaozhi Du
    Yurong Duan
    Metadata
    Show full item record
    Abstract
    Because large-scale building projects are designed through multiprofessional collaboration and the design changes are unavoidable and frequent, it is essential to efficiently detect the changes between submodels in different versions for building projects. However, the traditional methods may have lower efficiency problems, such as time-consuming and inaccurate results via manual operation and visual inspection. To address these issues, this paper proposes a submodel comparison method based on Industry Foundation Class (IFC) file contents, called as IFC-submodel content comparison (SCC). First, all instances in two IFC files were, respectively, preprocessed and stored in a unified format. Next, all instances related with the required demand were extracted to form submodels. Then, the instances of the two submodels were all checked to remove redundancies, respectively, and each remaining instance was assigned at least one signature, which is a string consisting of feature information. Finally, these instances in the two submodels were compared by their signatures in a breadth-first search manner, and the matched information and unmatched information were extracted. The experimental results showed that the proposed IFC-SCC method is superior compared with the previous methods. Compared with the globally unique identifier (GUID)-based comparison method, the IFC-SCC method generated more accurate matched information, and obtained an improvement in time efficiency by 16.85%. Compared with the flat-based comparison method, the IFC-SCC method had an improvement of 48.35% on the time efficiency on average and removed the redundancies.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4286174
    Collections
    • Journal of Computing in Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV