• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    New Evaluation Method for the Achievement Rate of Target Water Quality in Nakdong River, Republic of Korea

    Thumbnail
    View/Open
    (ASCE)HE.1943-5584.0002165.pdf (1.768Mb)
    Date
    2022-02-15
    Author
    Kang-Young Jung
    Kyung-Lak Lee
    Seong-Yun Hwang
    Yeongjae Lee
    Don-woo Ha
    Eun Hye Na
    Kyunghyun Kim
    Metadata
    Show full item record
    Abstract
    Water quality in the four major river basins in South Korea has been managed by introducing total maximum daily loads (TMDLs) to achieve or maintain a target water quality (TWC); TMDLs can be obtained by discharging the allocated pollutant loads from the watershed. The Nakdong River basin is the most important source of water supply among these four river basins and consists of 41 watershed units. The current method for evaluating the rate of load management involves calculating the measured values over the past 3 years through a log transformation process and assessing whether the TWC is achieved after comparing the values with the reference TWC. The objective of this study is to compare and analyze the results of a flow duration curve (FDC) and load duration curve (LDC) evaluation based on the current method for TWC evaluation and the daily flow data measured at 8-day intervals (weekly) to present an efficient TWC assessment method for more relevant flow conditions. The daily flow data were from 1995 to 2004, and the flow data measured at 8-day interval were from 2005 to 2015. The target study areas included the 41 watershed units on the Nakdong River basin (14 main streams and 27 tributaries). Biochemical oxygen demand (BOD) and total phosphorus (TP) constituted the water quality indicators studied. LDCs were prepared using the estimated daily flow rate, and the measured flow data at 8-day intervals based on the BOD and TP revealed similar results. Thus, even the data measured at 8-day intervals are considered applicable for creating FDCs and evaluating LDCs without requiring complex tests, calibrations, and prediction processes using a watershed model based on accumulated data over many years.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283660
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV