Show simple item record

dc.contributor.authorYugal Kishor Patanwar
dc.contributor.authorDebasis Deb
dc.date.accessioned2022-05-07T21:09:03Z
dc.date.available2022-05-07T21:09:03Z
dc.date.issued2022-2-1
dc.identifier.other(ASCE)GM.1943-5622.0002254.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283381
dc.description.abstractStability of underground working depends on geomechanical properties of rocks as well as geometrical and operational parameters of excavation. In this study, a fuzzy rule-based method, minimizing the subjectivity in rock engineering system (RES) is proposed to address the uncertainty in determining stability of underground pillars. A total of 243 elastoplastic 3D numerical models are analyzed by varying attributes of five input (leading) variables: (1) rock mass strength, (2) depth (in situ stress), (3) height of excavation (stope), (4) sequence of excavation with or without filling, and (5) crown pillar thickness. Interaction matrix between the leading input variables are evaluated using fuzzy “IF–THEN” rules considering the results of finite-element models (FEMs) and the “cause–effect” plot of the variables are also determined. Average equivalent plastic strain (EPS) over two consecutive pillars is the target output variable indicating the stability of the excavated zone (stope)–pillar system. Results of FEMs are plotted in the existing stope stability number graph and show that ESP¯≈0.06−0.07 denotes the boundary between “stable” and “transition” zone and ESP¯≈0.09−0.1 represents the boundary between “transition” and “caved” zone. A rib pillar stability index (RPSI) is formulated based on the vulnerability of a pillar for the evaluation of EPS¯ indicating the “stable” or “unstable” condition. Results show that plastic strain decreases exponentially with increasing RPSI having R2 of 0.824. The proposed concept is applied to determine the stability of stopes of a hard rock mine by estimating RPSI and EPS¯ and finds that they are placed in “stable” zone for the given geomining conditions.
dc.publisherASCE
dc.titleDevelopment of Coupled FEM and Fuzzy Rules–Based Procedures for Mitigation of Uncertainty in Forecasting Stability of Underground Pillars
dc.typeJournal Paper
dc.journal.volume22
dc.journal.issue2
dc.journal.titleInternational Journal of Geomechanics
dc.identifier.doi10.1061/(ASCE)GM.1943-5622.0002254
dc.journal.fristpage04021276
dc.journal.lastpage04021276-18
dc.page18
dc.treeInternational Journal of Geomechanics:;2022:;Volume ( 022 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record