• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Safety Monitoring of Bearing Replacement for a Concrete High-Speed Railway Bridge Based on Acoustic Emission

    Thumbnail
    View/Open
    (ASCE)CF.1943-5509.0001719.pdf (2.439Mb)
    Date
    2022-02-24
    Author
    Fengbo Ma
    Xiaoxiang Cheng
    Xiangyi Zhu
    Gang Wu
    De-Cheng Feng
    Shitong Hou
    Xuecheng Kang
    Metadata
    Show full item record
    Abstract
    As an important part of a bridge, bearings easily suffer damage when exposed to various loading and environmental changes during their lifetime. Bearing replacement should be performed in a timely manner if damage occurs to high-speed railway (HSR) bridges. The unique structural form and strict operation requirements mean that bearing replacements of HSR bridges are much more difficult than those of highway bridges. However, compared with bearing replacements of highway bridges, far fewer scientific and engineering studies have been conducted to guide the bearing replacement of HSR bridges. In this paper, based on a three-span continuous concrete box girder HSR bridge, an innovative bearing replacement method using reverse disassembly and assembly techniques is proposed and was implemented at a location under operating HSRs. In addition, safety monitoring measures were undertaken to guarantee the safety of the bridge during bearing replacement. In contrast to the usual monitoring practice focusing on the displacement and the external strain of the structure, this monitoring work adopted the acoustic emission (AE) detection technique to explore the internal structural damage formed in the process of construction. The results suggest that the proposed bearing replacement method, which requires the girder to be jacked up by no more than 9 mm, is a promising practice for this complicated construction, and the start time and evolution of damage in the concrete of a bridge during construction can be captured accurately by AE detection with a parameter-based analysis method. All practices presented in this case study can guide future bearing replacements in similar projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282992
    Collections
    • Journal of Performance of Constructed Facilities

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV