dc.contributor.authorKexin Zhang
dc.contributor.authorTianyu Qi
dc.contributor.authorDachao Li
dc.contributor.authorXinfeng Liu
dc.contributor.authorXingwei Xue
dc.contributor.authorFayue Wu
dc.date.accessioned2022-05-07T20:49:35Z
dc.date.available2022-05-07T20:49:35Z
dc.date.issued2022-01-05
dc.identifier.other(ASCE)CF.1943-5509.0001685.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282960
dc.description.abstractThis paper introduces a method of strengthening prestressed concrete continuous box-girder bridges with prestressed steel strands. Construction process monitoring, field load tests before and after reinforcement, and health monitoring after reinforcement were performed to verify the effectiveness of the external prestressed steel strand reinforcement method. During the construction monitoring process, the measured values of each tensioning step are basically consistent with the theoretical values, but the measured values are slightly less than the theoretical values. The results of the field load tests show that the bending strength and stiffness of the strengthened girder have been improved. During health monitoring, the strain value and deflection value data for some parts across the specified section were collected. According to the data, the strain and deflection values fluctuated within the specified limit, and the bridge was always in a safe state.
dc.publisherASCE
dc.titleHealth Monitoring–Based Assessment of Continuous Girder Bridge Reinforcement
dc.typeJournal Paper
dc.journal.volume36
dc.journal.issue2
dc.journal.titleJournal of Performance of Constructed Facilities
dc.identifier.doi10.1061/(ASCE)CF.1943-5509.0001685
dc.journal.fristpage04022001
dc.journal.lastpage04022001-14
dc.page14
dc.treeJournal of Performance of Constructed Facilities:;2022:;Volume ( 036 ):;issue: 002
dc.contenttypeFulltext