• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Transportation Engineering, Part B: Pavements
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Transportation Engineering, Part B: Pavements
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Reliability-Based Scheduling of Pavement Rehabilitation Considering Imperfect Repair

    Thumbnail
    View/Open
    JPEODX.0000334.pdf (1.255Mb)
    Date
    2021-10-28
    Author
    Saswati Das
    Anjan Kumar Siddagangaiah
    Metadata
    Show full item record
    Abstract
    This study integrated reliability-based pavement performance prediction with scheduling of rehabilitation, considering the imperfect effect of repair. Traffic and pavement structural response data were collected from the national highways of India and were analyzed statistically. Pavement reliabilities for traffic and construction quality uncertainty levels were estimated and modeled using the Weibull function. The timing and number of required rehabilitation treatments were identified using a hybrid hazard rate model coupled with a cost per unit time function. A case study was evaluated using the proposed framework. The hybrid hazard rate model captured the system’s faster degradation as the rehabilitation intervals were reduced by 2–3 years. The realistic imperfect repair cost applied was higher than the cost involved according to the traditional age-T policy. The associated risk, in terms of both cost and time, increases as the uncertainty in traffic and construction quality increases. Furthermore, the effect of traffic uncertainty was found to be significant in the case of pavement structures with lower variation in construction quality. However, beyond the 10% coefficient of variation (COV) level in construction quality, increasing traffic uncertainty from 5% to 25% COV did not influence the reliability trends considerably. Even at a higher uncertainty level of traffic, lowering the construction quality variation resulted in a substantial cost reduction and extended the cycle lengths by 2 years. The framework evaluated with a case study emphasized that although traffic uncertainty is inevitable during operation, strict quality control and assurance programs to reduce variability in pavement production minimize the maintenance and rehabilitation needs substantially.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282767
    Collections
    • Journal of Transportation Engineering, Part B: Pavements

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV