Show simple item record

dc.contributor.authorTaranom Ekramnia
dc.contributor.authorMahdi Nasimifar
dc.date.accessioned2022-05-07T20:41:29Z
dc.date.available2022-05-07T20:41:29Z
dc.date.issued2021-10-21
dc.identifier.otherJPEODX.0000329.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282762
dc.description.abstractA primary goal of the pavement management system is to identify the optimal treatment type and its timing to maximize investment returns. The remaining service interval (RSI) is a new terminology representing the time remaining until the need to perform a defined construction event. This approach predicts a structured sequence of maintenance programs based on life cycle cost (LCC) considerations, which, while providing the required functions, is economically optimal. The present paper developed a computer program called MRRIUT to facilitate using the RSI approach at a network-level pavement management system. A reliable and practical cost–benefit optimization approach has been implemented in the program. Performance models developed from the Long-Term Pavement Performance (LTPP) database were used to predict pavement performance over its design life. The developed tool allows organizations to make a more informed decision at the network level by choosing appropriate types and timing of construction events while providing users with a maximum service level.
dc.publisherASCE
dc.titleDevelopment of a Methodological Tool for Treatment Prioritization in Network-Level Pavement Management System
dc.typeJournal Paper
dc.journal.volume148
dc.journal.issue1
dc.journal.titleJournal of Transportation Engineering, Part B: Pavements
dc.identifier.doi10.1061/JPEODX.0000329
dc.journal.fristpage04021069
dc.journal.lastpage04021069-9
dc.page9
dc.treeJournal of Transportation Engineering, Part B: Pavements:;2021:;Volume ( 148 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record