Show simple item record

dc.contributor.authorMichael A. Hartman
dc.contributor.authorKenneth N. Mitchell
dc.contributor.authorLauren M. Dunkin
dc.contributor.authorJames Lewis
dc.contributor.authorBenjamin Emery
dc.contributor.authorNicholas F. Lenssen
dc.contributor.authorRonald Copeland
dc.date.accessioned2022-05-07T20:37:47Z
dc.date.available2022-05-07T20:37:47Z
dc.date.issued2022-3-1
dc.identifier.other(ASCE)WW.1943-5460.0000684.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282681
dc.description.abstractThe United States Army Corps of Engineers (USACE) maintains the Mississippi River, Baton Rouge, Louisiana, to the Gulf of Mexico Project as part of its Navigation mission to enable safe, reliable, and cost-effective marine transportation throughout the country. The entrance channel for this vast inland port system is known as Southwest Pass (SWP) and is the most highly utilized commercial deep-draft waterway in the nation. In recent years, the SWP has been prone to rapid-onset shoaling, with predictive lead times based on upstream river discharge rates of only about 14 days. The daily survey frequency in combination with the Dredging Quality Management (DQM) dredging records now available provide the framework for better understanding the dynamic shoaling conditions and the relative role of USACE dredging activity toward restoring full channel navigability.
dc.publisherASCE
dc.titleSouthwest Pass Sedimentation and Dredging Data Analysis
dc.typeJournal Paper
dc.journal.volume148
dc.journal.issue2
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)WW.1943-5460.0000684
dc.journal.fristpage05021017
dc.journal.lastpage05021017-8
dc.page8
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;2022:;Volume ( 148 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record