• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Establishment and Repetition Survey of Primary GNSS Control Network of Hong Kong–Zhuhai–Macao Bridge

    Thumbnail
    View/Open
    (ASCE)SU.1943-5428.0000386.pdf (1016.Kb)
    Date
    2021-10-28
    Author
    Dijun Wu
    Wei Xiong
    Jiming Guo
    Metadata
    Show full item record
    Abstract
    The Hong Kong–Zhuhai–Macao Bridge (HZMB) is the longest sea-crossing bridge in the world. The primary Global Navigation Satellite System (GNSS) control network of the HZMB has the outstanding characteristics and difficulties of long distance across the sea (nearly 32 km) in an approximate east–west direction, poor satellite positioning environment, high precision requirement of construction positioning, long construction period, and complicated transformations of the coordinate systems of China, Hong Kong, Zhuhai, Macao, and the HZMB project. Taking the primary GNSS control network of the HZMB as an example, this paper studied the key technical issues in establishment and repetition survey of the primary GNSS control network of a large-scale and high-precision sea-crossing bridge. Firstly, the three-dimensional engineering coordinate system based on International Terrestrial Reference Frame (ITRF) and the two-dimensional plane coordinate system with projection length deformation less than 5  mm/km were designed and established according to the engineering characteristics and requirements. Secondly, the control point selection, networking, and observation schemes were designed. Thirdly, the data processing technologies of high-precision GNSS control network of sea-crossing bridge and tunnel engineering project, including International GNSS Service (IGS) reference station technology, satellite orbit fixing technology, various error correction techniques, and engineering datum network technology, were studied and put forward. Fourthly, the accuracy analysis of baseline solution and network adjustment was carried out by using the fifth repetition survey data of the primary GNSS control network of the HZMB. Finally, the repetition survey results of the network were compared and analyzed.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4282503
    Collections
    • Journal of Surveying Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV