Show simple item record

dc.contributor.authorSonghee Lee
dc.contributor.authorChadon Lee
dc.date.accessioned2022-05-07T20:26:18Z
dc.date.available2022-05-07T20:26:18Z
dc.date.issued2022-01-07
dc.identifier.other(ASCE)ST.1943-541X.0003290.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282425
dc.description.abstractDuring steam curing of concrete, the axial restraint of pretensioned strands causes thermal prestress loss of the strands accumulated until sufficient bonding occurs. A theoretical model is presented in this paper to predict the progressive slippage of strands with time, bonding time, and the amount of thermal prestress loss. The model incorporating the equivalent age-dependent local bond-slip relationships considers the effects of material-related factors, the layout of the prestressing system, and changes in the temperature. Three pairs of two monostrand pretensioned concrete prisms were fabricated to validate the developed model. The model was able to trace the experimentally measured progressive slippage of the strand reasonably well, and it predicted thermal prestress losses by 5.2%–5.5% of the initial prestress of 1,395 MPa for the tested prisms.
dc.publisherASCE
dc.titleBonding Time and Prestress Loss in Precast Pretensioned Concrete during Steam Curing
dc.typeJournal Paper
dc.journal.volume148
dc.journal.issue3
dc.journal.titleJournal of Structural Engineering
dc.identifier.doi10.1061/(ASCE)ST.1943-541X.0003290
dc.journal.fristpage04022002
dc.journal.lastpage04022002-11
dc.page11
dc.treeJournal of Structural Engineering:;2022:;Volume ( 148 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record