Show simple item record

dc.contributor.authorPraveena Munianday
dc.contributor.authorAfiqah R. Radzi
dc.contributor.authorMuneera Esa
dc.contributor.authorRahimi A. Rahman
dc.date.accessioned2022-05-07T19:58:09Z
dc.date.available2022-05-07T19:58:09Z
dc.date.issued2022-03-09
dc.identifier.other(ASCE)ME.1943-5479.0001038.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281856
dc.description.abstractBuilding information modeling (BIM) is an emerging approach to managing the design, construction, operation, and maintenance of projects. However, the lack of organizational BIM capabilities prevents BIM from being generally adopted across the architecture, engineering, and construction (AEC) industry. Therefore, AEC organizations must develop strategic plans to support BIM implementation and ensure that the anticipated benefits of BIM are realized. This study identifies the underlying factors and strategies related to organizational BIM capabilities and develops a structural equation model to establish their causal relationships. A systematic literature review of 26 articles and semi-structured interviews with BIM practitioners provided 19 factors and 14 strategies. A total of 121 BIM practitioners evaluated the criticality of the factors and strategies through a survey. The collected data were analyzed using the Kruskal–Wallis test, exploratory factor analysis (EFA), and partial least-squares structural equation modeling (PLS-SEM). The factor analysis classified the factors into two groups (organizational BIM capabilities and organizational capabilities) and strategies into three groups (capability requirement, organizational culture, and organizational competitiveness). The structural equation model revealed that organizational culture positively affects both organizational and BIM capabilities. Moreover, organizational competitiveness is shown to positively influence organizational capabilities. These results provide evidence for the development of strategies for implementing BIM. Practitioners may use these strategies to develop strategic plans and prioritize efforts in a more effective manner. With the findings of this research, users will have a better understanding of the relationships between factors and strategies that are associated with organizational BIM capabilities.
dc.publisherASCE
dc.titleOptimal Strategies for Improving Organizational BIM Capabilities: PLS-SEM Approach
dc.typeJournal Paper
dc.journal.volume38
dc.journal.issue3
dc.journal.titleJournal of Management in Engineering
dc.identifier.doi10.1061/(ASCE)ME.1943-5479.0001038
dc.journal.fristpage04022015
dc.journal.lastpage04022015-13
dc.page13
dc.treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record