• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Impact of COVID-19 Pandemic on Demand, Output, and Outcomes of Construction Projects in Singapore

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001020.pdf (223.3Kb)
    Date
    2021-12-27
    Author
    Florence Y. Y. Ling
    Zhe Zhang
    Aurelia Y. R. Yew
    Metadata
    Show full item record
    Abstract
    This study investigated the impact of COVID-19 pandemic on Singapore’s construction industry in terms of construction demand, output, prices and project performance. A three-pronged research approach was adopted: a survey, analyzing published statistical data, and conducting in-depth interviews with subject matter experts. The survey revealed that projects suffered significant delays and cost overruns and lower quality. It was found that construction demand and output decreased by 27.9% and 28.6%, respectively. Some project owners postponed awarding contracts or calling tenders because prices exceeded their budgets. While waiting for bid prices to decrease, they re-evaluated the feasibility, scope, design, budget, and timeline of their projects. Contraction of construction output was found to be due to a severe shortage of labor and to lower productivity as a consequence of complying with many safe management measures. The results of autoregressive time-series modeling predicted that tender prices will continue to rise in the short term before decreasing after mid-2022. Although manual labor may be replaced by productive technologies if technology is cheaper than labor, this was not found to be the case. The originality of this research is that it empirically quantified project outcomes due to the pandemic and predicted tender price indexes for the next 5 years. These predicted indexes are useful for estimating the risk and markup to be added to the base construction cost. The value of this research is that it informs policy makers that regulations need to be enacted to compel the adoption of productive technologies to reduce reliance on labor. Otherwise, the worker shortage problems faced in this pandemic may continue to surface in future pandemics. The implication of adopting productive technologies is that project owners must increase the project budget because these technologies cost more than manual labor. However, the cost might be passed to end users, who will end up paying more.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281836
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV