• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Management in Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    BIM-Based Framework for Formwork Planning Considering Potential Reuse

    Thumbnail
    View/Open
    (ASCE)ME.1943-5479.0001004.pdf (2.217Mb)
    Date
    2021-12-01
    Author
    Zhongya Mei
    Maozeng Xu
    Peng Wu
    Siyu Luo
    Jun Wang
    Yi Tan
    Metadata
    Show full item record
    Abstract
    Concrete formwork is frequently required with the increasing demands of building and infrastructure construction and has a significant impact on the costs of concrete works. Onsite formwork planning is often conducted via site managers’ individual experience, resulting in low efficiency and waste production. The potential reuse and material waste reduction of concrete formwork should be focused on, and an automated and accurate planning approach is required. Therefore, this study proposes a building information modeling (BIM)-based framework to assist site managers in automatically obtaining accurate demands of concrete formwork to reduce waste and costs. The developed framework is introduced to provide an approach to information extraction, potential reuse, and waste reduction of concrete formwork and consists of three major parts: component information extraction, panel use planning, and concrete form planning. Geometry and quantity information of building concrete components is automatically extracted from a BIM model to provide more accurate quantity take-offs compared with the conventional two-dimensional (2D) drawings. Demands of reused formwork panels are then calculated by a designed rule–based algorithm and rules based on trades’ know-how. Finally, quantities of concrete forms are minimized using a 2D cutting stock problem optimization model based on the genetic algorithm. An illustrative example of a reinforced concrete building for formwork planning is analyzed using the developed framework. Results show that the developed BIM-based framework can automatically generate an accurate plan and assist to save 28% of the formwork purchase cost compared with expert-based planning methods. Furthermore, the framework has great potential for more accurate decisions making in formwork layout planning, processing, and onsite storage.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4281822
    Collections
    • Journal of Management in Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV