| dc.contributor.author | Ibrahim Osman | |
| dc.contributor.author | Hossein Ataei | |
| dc.contributor.author | Abolfazl Seyrfar | |
| dc.date.accessioned | 2022-05-07T19:53:07Z | |
| dc.date.available | 2022-05-07T19:53:07Z | |
| dc.date.issued | 2022-01-10 | |
| dc.identifier.other | (ASCE)LA.1943-4170.0000534.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4281778 | |
| dc.description.abstract | The differing site conditions (DSC) clause, commonly known as changed conditions, is one of the most frequently litigated clauses in construction contracts. It is well established that the purpose of a DSC clause is to shift the risk of unknown physical conditions to the owner and reduce the construction cost. Parties to DSC disputes not understanding what must be substantiated in a case can lead to a plethora of costly and time-consuming proceedings. Additionally, the misinterpretation of the roles of soil reports, disclaimers, and site visit requirements ultimately produce the same result. The study will provide a guideline of the essentials required to win a DSC claim and a clarification of the misconceptions associated with the role of the contract documents, as well as an analysis of the judicial history of DSC cases. The findings will promote a more thorough understanding of the matters involved in DSC claim litigation. As a result, they will lead to improved contract administration and reduce prolonged and costly litigation for construction projects. | |
| dc.publisher | ASCE | |
| dc.title | Differing Site Conditions: Clarifying Misunderstandings to Reduce Costly Litigation | |
| dc.type | Journal Paper | |
| dc.journal.volume | 14 | |
| dc.journal.issue | 2 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/(ASCE)LA.1943-4170.0000534 | |
| dc.journal.fristpage | 04522002 | |
| dc.journal.lastpage | 04522002-7 | |
| dc.page | 7 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 002 | |
| dc.contenttype | Fulltext | |