• Login
    View Item 
    •   DSpace Home
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    •   DSpace Home
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Levelized Cost of Energy Assessment for Offshore Wind Farms—An Examination of Different Methodologies, Input Variables, and Uncertainty

    Thumbnail
    View/Open
    risk_007_04_040906.pdf (427.0Kb)
    Date
    2021
    Author
    McAuliffe, Fiona Devoy
    Noonan, Miriam
    Murphy, Jimmy
    Metadata
    Show full item record
    Abstract
    Levelized cost of energy (LCoE) is the most common metric used in renewable energy assessments. However, this can be a very complex calculation with numerous methodologies depending on the perspective taken. Inputs including costs, energy production are generally forecasts and predictions based on publicly available information; therefore, they are key areas of uncertainty. Elements of the calculation are site or region specific such as the tax rate or inclusion of grid connection costs. The business case and financial assumptions applied will be very project specific, e.g., the discount rate applied. These numerous variables and uncertainties must be fully understood in order to effectively apply the metric or review and compare LCoEs. Therefore, this paper provides a comprehensive set of LCoE methodologies that provide a reference basis for researchers. A case study demonstrates the application of these methods and the variation in results illustrates the importance of correctly selecting the discount rate and cash flow based on the perspective and motivation of the user. Sensitivity studies further investigates the potential impact of key variables and areas of uncertainty on results. Analysis indicates that the energy production and discount rate applied will have the most significant impact on LCoE, followed by Capital Expenditure (CAPEX) costs. While the key areas of uncertainties cannot necessarily be solved, this paper promotes consistency in the application and understanding of the metric, which can help overcome its limitations.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4278861
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV