• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimization of Managed Drawdown for a Well With Stress-Sensitive Conductivity Fractures: Workflow and Case Study

    Thumbnail
    View/Open
    jert_143_8_083006.pdf (1.281Mb)
    Date
    2020
    Author
    Wei, Yunsheng
    Wang, Junlei
    Jia, Ailin
    Liu, Cheng
    Luo, Chao
    Qi, Yadong
    Metadata
    Show full item record
    Abstract
    The effect of bottomhole-pressure (BHP) drawdown schedule on the well performance is generally attributed to the stress sensitivity in propped finite-conductivity fractures. The purpose of this work is to develop a detailed workflow of optimizing BHP drawdown schedule to improve long-term performance by finding a tradeoff between delaying conductivity degradation and maintaining drawdown. First, according to experimental data of propped fracture, an alternative relationship between conductivity and pressure drawdown is developed to mimic the change of fracture conductivity with effective stress. Second, based on the dimension-transformation technique, the coupled fracture-reservoir model is semi-analytically solved and seamlessly generates the time-dependent equation (i.e., transient inflow performance relationship (IPR)) which provides the production rate response to any BHP variation. Next, the value of BHP on the reversal behavior of rate is defined as the optimum BHP on the specified time-dependent IPR, and then the optimum profile of BHP drawdown over time is achieved. Finally, we corroborate the effectiveness of this workflow with a field case from Zhaotong shale in China. Field case substantiates that (1) the well with restricted drawdown has more advantage of improving the performance than that with unrestricted drawdown and (2) after inputting the optimum BHP drawdown into the history-unrestricted case, the long-term cumulative gas production could indeed be increased.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4277937
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV