Show simple item record

dc.contributor.authorZhang, Angang
dc.contributor.authorFan, Zifei
dc.contributor.authorZhao, Lun
dc.contributor.authorWang, Jincai
dc.contributor.authorSong, Heng
dc.date.accessioned2022-02-05T22:39:54Z
dc.date.available2022-02-05T22:39:54Z
dc.date.copyright11/19/2020 12:00:00 AM
dc.date.issued2020
dc.identifier.issn0195-0738
dc.identifier.otherjert_143_8_083005.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4277935
dc.description.abstractMaterial balance is a basic principle in reservoir engineering, which is still used as a quick and easy analytical tool for reservoir evaluation. In this article, a new methodology of production performance prediction for water-flooding reservoir was proposed based on the material balance principle, which considers the water saturation change caused by water injection and natural water influx, and its effect on transient gas–oil ratio. Among them, the cumulative water production was calculated based on Tong’s water-driver performance curve; the cumulative water influx was obtained by the Fetkovitch method; the transient gas–oil ratio can be acquired by Darcy’s law and Baker’s relative permeability model. Comparisons have been made between the new methodology and commercial reservoir simulator for two different reservoirs. The results show that there is good similarity between these two tools, which verifies the correctness of the new methodology.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleA New Methodology of Production Performance Prediction for Strong Edge-Water Reservoir
dc.typeJournal Paper
dc.journal.volume143
dc.journal.issue8
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.4049020
dc.journal.fristpage083005-1
dc.journal.lastpage083005-8
dc.page8
dc.treeJournal of Energy Resources Technology:;2020:;volume( 143 ):;issue: 008
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record