Show simple item record

dc.contributor.authorNarayanan, Muthalagappan
dc.date.accessioned2022-02-05T22:36:44Z
dc.date.available2022-02-05T22:36:44Z
dc.date.copyright3/23/2021 12:00:00 AM
dc.date.issued2021
dc.identifier.issn0195-0738
dc.identifier.otherjert_143_5_051302.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4277842
dc.description.abstractWhitebox model in a model predictive controller (MPC) for energy systems, though does help in developing an accurate system model, requires a long time for optimization. In this article, an adaptation of the clustering technique used in hardware-in-the-loop testbench is proposed for evaluation of the MPC on an annual scale with selected six representative days in a year for that particular system and location. Initially, the various input parameters for clustering (algorithm, distance metric, and datapoint input dimensions) are studied for the selected thermal-electrical integrated renewable energy system (with solar thermal collectors, auxiliary gas boiler, stratified thermal storage, micro fuel cell combined heat and power (FC-CHP), photovoltaic system, a lithium-ion battery) for a Sonnenhaus standard single-family residential building. Finally, the proposed methodology is used to compare the annual derived energy values and key performance indicators (KPIs) for an MPC implementation with a status quo controller as a reference. Also, extreme exemplary weather days are investigated as the selected representative days were only average days in each season. Despite the conflict of using the FC-CHP on cold sunny days, instead of utilizing the battery and increased gas boiler energy input, a 9% increase in decentral system fraction is reported. Via the use of MPC instead of status quo controllers, the results indicate −18% space heating (SH) demand; +30% solar thermal energy production; −29% gas boiler energy supply; −52% power-to-heat thermal energy supply; −52% electrical fuel cell production; +240 kWh battery utilization; and −52% reduced grid import at the expense of 1.2% of the electrical load demand as grid import.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleAnnual Evaluation of a Model Predictive Controller in an Integrated Thermal-Electrical Renewable Energy System Using Clustering Technique
dc.typeJournal Paper
dc.journal.volume143
dc.journal.issue5
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.4050493
dc.journal.fristpage051302-1
dc.journal.lastpage051302-14
dc.page14
dc.treeJournal of Energy Resources Technology:;2021:;volume( 143 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record