Show simple item record

dc.contributor.authorArena, Felice
dc.contributor.authorLaface, Valentina
dc.contributor.authorMalara, Giovanni
dc.contributor.authorMeduri, Saveria
dc.contributor.authorPedroncini, Andrea
dc.date.accessioned2022-02-05T21:59:51Z
dc.date.available2022-02-05T21:59:51Z
dc.date.copyright1/21/2021 12:00:00 AM
dc.date.issued2021
dc.identifier.issn2332-9017
dc.identifier.otherrisk_007_01_010903.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4276713
dc.description.abstractThis article deals with the case study of a marina located in Roccella Jonica (Italy), where a wave energy harvester belonging to the family of U-oscillating water columns (U-OWC) is going to be installed. U-OWCs are wave energy harvesters composed of a water column exposed to the action of random sea waves and an air pocket connected to the atmosphere by a power take—off (PTO) system. In Roccella Jonica, this device is going to be embedded in a vertical breakwater expanding the main layout of the infrastructure. For ensuring the structural safety of the system, to characterize statistically its response peaks in severe environmental conditions is important. In this context, one of the main difficulties is utilizing appropriate environmental conditions representing real extreme events at the installation site. This article proposes to adopt the DNV trapezoidal storm model for representing the time history of an extreme event in conjunction with a nonlinear U-OWC model. Relevant Monte Carlo simulations show that the DNV storm model provides peak distributions that are rather close to the ones obtained by processing real storm time histories. Thus, it can be adopted for checking the performance of the system in extreme conditions.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleResponse Statistics of U-Oscillating Water Column Energy Harvesters Exposed to Extreme Storms: Application to the Case Study of Roccella Jonica (Italy)
dc.typeJournal Paper
dc.journal.volume7
dc.journal.issue1
dc.journal.titleASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg
dc.identifier.doi10.1115/1.4049210
dc.journal.fristpage010903-1
dc.journal.lastpage010903-11
dc.page11
dc.treeASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg:;2021:;volume( 007 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record