Show simple item record

dc.contributor.authorH. Randolph Thomas
dc.contributor.authorVictor E. Sanvido
dc.contributor.authorSteve R. Sanders
dc.date.accessioned2017-05-08T21:12:25Z
dc.date.available2017-05-08T21:12:25Z
dc.date.copyrightSeptember 1989
dc.date.issued1989
dc.identifier.other%28asce%290733-9364%281989%29115%3A3%28370%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/42731
dc.description.abstractRecent CII research has indicated that formal material management programs have the potential to yield significant construction cost savings, yet small‐ and medium‐sized commercial contractors may not feel that an integrated material management program is cost effective. The objective of this paper is to quantify the adverse impacts of ineffective material management practices. Data collected as part of an ongoing construction productivity study is used to analyze and compare the effects of material management practices on two steel erection projects. Rules of credit were applied to calculate the daily output. Adverse conditions caused by the lack of an effective material management program are identified, and the days on which the conditions occurred are noted. For these days, the actual daily productivity is compared with the expected productivity to determine the number of work‐hours lost. The cost impact is compared to the cost of effective material management. The results show a benefits/cost ratio of 5.7, favoring greater attention to material management.
dc.publisherAmerican Society of Civil Engineers
dc.titleImpact of Material Management on Productivity—A Case Study
dc.typeJournal Paper
dc.journal.volume115
dc.journal.issue3
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/(ASCE)0733-9364(1989)115:3(370)
dc.treeJournal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record