• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Impact of Variation in Estimated Quantity Clauses on Allocating Financial Risks in Measurement Contracts

    Thumbnail
    View/Open
    %28ASCE%29LA.1943-4170.0000499.pdf (190.8Kb)
    Date
    11/1/2021
    Author
    Omar Alhyari
    Khaled Hesham Hyari
    Metadata
    Show full item record
    Abstract
    Unit price contracts are awarded to contractors based on estimated quantities of work, while payments to contractors are based on the actual quantities performed. Deviations between such estimated and actual quantities expose contractors and owners to various amounts of financial risks. In order to reduce those risks, variation in estimated quantity (VEQ) clauses are usually found in construction contracts. There is a need to support contractors in analyzing and quantifying the financial risks associated with the terms of the applicable changed quantity clauses. This paper presents a review of the terms of VEQ clauses included in public construction contracts. Then the paper examines the impact of VEQ clauses on the distribution of financial risks associated with changes in quantities between the owner and the contractor. The paper shows significant inconsistencies between the terms and stipulations of variation in estimated quantity clauses adopted by different US public construction authorities and international construction contract forms. An illustrative example is provided to highlight and quantify the varying amounts of risks incurred by contractors, depending on the terms and conditions of the variation in estimated quantity clause imposed by the contracting public authority in the construction contract. Contractors should be able to identify and quantify these risks before submitting their bid offers. The performed analysis should prove to be useful to the contracting parties and can reduce the potential for disputes related to changes in quantities of work.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4272445
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV