• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Behavior of Overdeformed Shield Tunnel Lining under Grouting Treatment: Field Experiment

    Thumbnail
    View/Open
    %28ASCE%29CF.1943-5509.0001657.pdf (1.782Mb)
    Date
    12/1/2021
    Author
    Tianran Han
    Gang Wu
    Yong Lu
    Baiyong Yu
    Yong Gao
    Metadata
    Show full item record
    Abstract
    Shield tunnel structures are commonly found to be overdeformed in Eastern China soft ground due to adjacent engineering activities. Grouting treatment could serve as a viable solution to actively reduce the excessive diametrical expansion of tunnel linings. However, understanding the grouting-induced effects on adjacent tunnel structures remains preliminary due to the scarcity of well-documented case histories. In this study, a field experiment was conducted to explore a shield metro tunnel’s real performance during grouting treatments. An extensive monitoring scheme was deployed while varied geometrical grouting arrangements were carried out. The tests provided a comprehensive database of the tunnel responses in multiple temporal resolution levels, both during the entire course of the grouting treatment and within single grouting operations. Investigations are carried out over the influencing factors of the grouting efficiency. The experimental observations suggest that grouting efficiency tends to evolve with time and can be affected by various geometrical grouting parameters. Observations are also presented and discussed in detail for the influence of grouting history on the convergence distribution and the tunnel’s performance after the termination of all grouting operations. Time-variant behaviors of the tunnel are depicted in detail, such as the convergence recovery and rebound during the grouting process. Overall, this case study brings new insights into understanding the grouting-induced tunnel lining response. It can also serve as a benchmark for further theoretical and numerical studies.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271942
    Collections
    • Journal of Performance of Constructed Facilities

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV