• Login
    View Item 
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Probabilistic Analysis of Tunnel Roof Deflection under Sequential Excavation Using ANN-Based Monte Carlo Simulation and Simplified Reliability Approach

    Thumbnail
    View/Open
    AJRUA6.0001170.pdf (3.061Mb)
    Date
    1/1/2021
    Author
    Mingliang Zhou
    Mahdi Shadabfar
    Yadong Xue
    Yi Zhang
    Hongwei Huang
    Metadata
    Show full item record
    Abstract
    Tunnel roof deflection is an important measure to control the safety of excavation activity, especially for large-section tunnels using the sequential construction method. A three-dimensional (3D) model of a sequential excavation project in the Lijiaping metro tunnel, Chongqing, China, was developed and the maximum tunnel roof deflection was calculated deterministically at the end of each excavation stage. By defining the characteristics of the soft rock layers surrounding the tunnel section as the random variables, a probabilistic analysis was conducted and the problem was formulated as a reliability model. Two different approaches were used to solve the established reliability problem. One entails an artificial neural network (ANN) trained by a large data set obtained from numerical simulations and then accompanied by the Monte Carlo (MC) sampling method to calculate the probability. The other is a simplified reliability approach using a small data set to approximate the exceedance probability via a regression-based algorithm. The proposed ANN-based metamodel used in the first method could accurately predict tunnel roof deflection and replace the software simulator. Subsequently, the probabilistic results obtained from this method following MC sampling could well converge and provide the probability with enough accuracy. Interestingly, the simplified approach with more than 40 random samples can also provide acceptable results, which provides an economical approach to estimate the exceedance probability.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271784
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV