• Login
    View Item 
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Development of a New Technique for Safety Risk Assessment in Construction Projects Based on Fuzzy Analytic Hierarchy Process

    Thumbnail
    View/Open
    AJRUA6.0001157.pdf (507.6Kb)
    Date
    9/1/2021
    Author
    Mohsen Mahdinia
    Mohsen Sadeghi Yarandi
    Ehsan Jafarinia
    Ahmad Soltanzadeh
    Metadata
    Show full item record
    Abstract
    This study follows the fuzzy analytic hierarchy process to develop a semiquantitative technique to assess the safety risk of construction projects based on effective parameters affecting the probability and severity rates. Various studies targeting safety risk assessment in construction projects together with their research characteristics were investigated. In the second step, the initial structure of risk assessment was designed based on a semiquantitative technique of safety risk assessment. In the third step, a three-round Delphi method was employed, and an expert panel comprising 41 project managers and senior authorities of construction projects determined the existing components of the two factors of risk probability and severity. Finally, the weights of the components of risk probability and severity were determined so that their roles in determining the level of final risk could be specified. The normalized weights of probability and severity factors for calculating the semiquantitative safety were 0.48296 and 0.51704, respectively. Moreover, the incident probability factor included the four components of technical inspection, human reliability, incident learning, and hazard detection, with the following weights, respectively: 0.303, 0.364, 0.088, and 0.245. The incident severity factor included the four components of human injury, financial loss, operational interruption, and reputation damage, with the following weights, respectively: 0.369, 0.233, 0.191, and 0.207. The utilization of this technique can help reduce the risk of occupational incidents in construction projects.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271772
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV