• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Strengthening of Steel Connections in a 92-Year-Old Railway Bridge Using Prestressed CFRP Rods: Multiaxial Fatigue Design Criterion

    Thumbnail
    View/Open
    %28ASCE%29BE.1943-5592.0001714.pdf (4.078Mb)
    Date
    6/1/2021
    Author
    Hossein Heydarinouri
    Alain Nussbaumer
    Masoud Motavalli
    Elyas Ghafoori
    Metadata
    Show full item record
    Abstract
    This paper presented a new retrofit system for strengthening the stringer-to-floor-beam double-angle connections in a 92-year-old riveted railway bridge in Switzerland, using prestressed carbon fiber-reinforced polymer (CFRP) rods. The strengthening system transmitted the forces purely through friction, with minimum interference with bridge traffic. The system consisted of two components: a newly developed mechanical wedge-barrel anchor to hold the prestressed CFRP rod and a clamping system attaching the stringer flange. The strengthening system reduced the out-of-plane deformation of the connections, resulting in a reduction in the distortion-induced stresses in the connections. The short-term bridge measurements showed that the application of a total prestressing force of 100 kN reduced the dominant mean stress in the connection hotspot by 47% (from 22.9 to 10.9 MPa) under the passage of passenger trains, whereas the stress range remained unchanged. Using the modified Wöhler curve method (MWCM) as a critical plane-based multiaxial fatigue model, the strengthening system was observed to reduce the multiaxial mean stress parameter by 30% under the passenger train loads. The long-term monitoring of the strengthening system, using a wireless sensor network (WSN) system, indicated no prestress loss in the CFRP rods during the seven-month period since its installation.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4270324
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV