Show simple item record

dc.contributor.authorKaustav Ray Mandal
dc.contributor.authorSubhasish Das
dc.contributor.authorAsis Mazumdar
dc.date.accessioned2022-01-31T23:43:02Z
dc.date.available2022-01-31T23:43:02Z
dc.date.issued8/1/2021
dc.identifier.other%28ASCE%29PS.1949-1204.0000558.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4270223
dc.description.abstractPlumbing planners and architects choose to use the 1940s Hunter curve that articulated domestic demand to solve the complex and multifaceted difficulties they found in the probabilistic process. This curve was designed to predict the water demand for the installation of high-performance streams operating at an almost maximized level of confidence (CL) of 99%. Many everyday things have changed for the better. At the moment, these problems are creating overestimation consequences according to Hunter’s curve. Allowing the use of modern water use appliances does not reflect the consequences of water sustentation. In the background, Hunter’s curve was modified in 2014 for a maximum of 300 fixtures. In the present study, to meet the high and optimum water demand, Hunter’s curve was remodified by up to 1,000 fixtures by incorporating low flow rates in modern flush valves to effectively reduce CLs, leading to significant water savings. The standardization of the fixture units for those operating valves has been established and is done efficiently using the binomial-probability-function for large-scale system operations, i.e., at various flow rates, low CLs, and reduced consumption. In such a case, water savings can be achieved by 80%–95% in relation to Hunter’s original adoption. The redesigned Hunter curves for optimized CLs used in the current paper focus on the excellent performance of plumbing design by improving water use and prevention.
dc.publisherASCE
dc.titleStandardization of Fixture Units for Modern Flush Valves by Optimizing Water Demand Using Modified Hunter’s Curve
dc.typeJournal Paper
dc.journal.volume12
dc.journal.issue3
dc.journal.titleJournal of Pipeline Systems Engineering and Practice
dc.identifier.doi10.1061/(ASCE)PS.1949-1204.0000558
dc.journal.fristpage04021022-1
dc.journal.lastpage04021022-31
dc.page31
dc.treeJournal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 012 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record