• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Role of Construction Project Documentation for Effective Arbitration Process

    Thumbnail
    View/Open
    %28ASCE%29LA.1943-4170.0000466.pdf (1.966Mb)
    Date
    5/1/2021
    Author
    Farrukh Arif
    Faiza Saeed
    Metadata
    Show full item record
    Abstract
    Among various alternate dispute resolution (ADR) mechanisms, arbitration is one that offers several advantages such as the freedom to select a judge who better understands technicalities of construction; consequently, it also saves time and cost compared with the regular court proceedings. This study focuses on current practices, effectiveness of the process and the role of project documentation in the effectiveness of arbitration. Data was collected from clients, contractors, and arbitrators, which show that arbitration is not a very effective option of dispute resolution in Pakistan due to several reasons, such as the stakeholders’ low level of satisfaction with the process, bottlenecks, nonsupportive behavior of parties, time consumption, and being a costly mechanism. These causes along with its effects are illustrated in this study through an Ishikawa (fishbone) diagram. The results of key project documents were integrated using analytic hierarchy process (AHP). This study provides awareness of process and highlight areas for further investigation by identifying reasons for low effectiveness of the arbitration process in local industry. The importance of prioritization of project documentation will facilitate conflicting parties in the record keeping.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269781
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV