• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Determinants of Time Overruns in Portuguese Public Projects

    Thumbnail
    View/Open
    %28ASCE%29IS.1943-555X.0000597.pdf (436.5Kb)
    Date
    6/1/2021
    Author
    Francisco Pinheiro Catalão
    Carlos Oliveira Cruz
    Joaquim Miranda Sarmento
    Metadata
    Show full item record
    Abstract
    Infrastructure project delivery is a central topic in construction and project management. Time overruns are a critical dimension of successful project delivery. A significant body of knowledge exists regarding the understanding of time overruns. However, the literature has focused on endogenous determinants (project-related characteristics). This research expands the existing literature by explicitly analyzing exogenous determinants, such as the economic environment, governance and institutional quality, and legal and political frameworks. The paper analyses a set of 250 projects and attempts to understand the patterns and determinants of time overruns through an innovative approach based on the incorporation of exogenous determinants, examples being political, legal and regulatory, and economic ones. The findings confirm the hypothesis that time deviation distributions exhibit right skewness. In the used sample, the weighted average time deviation is 42.6%, and the mean time deviation is 36.7%, with a standard deviation of 32.9%. The results show that exogenous determinants have a substantial impact on time deviations (particularly political, institutional, and governance environment ones), as well the legal and institutional environment and economic context. Local government projects have more time deviations than those developed by the central government. Furthermore, no evidence was found to support that larger projects are more prone to time deviations than smaller ones.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4269731
    Collections
    • Journal of Infrastructure Systems

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV