Show simple item record

dc.contributor.authorMasayuki Tai
dc.contributor.authorYoshitomo Nagamine
dc.contributor.authorTetsuhiro Shimozato
dc.contributor.authorYoshiaki Tamaki
dc.date.accessioned2022-01-30T22:46:49Z
dc.date.available2022-01-30T22:46:49Z
dc.date.issued3/1/2021
dc.identifier.other(ASCE)ST.1943-541X.0002933.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269587
dc.description.abstractThis study investigated the residual clamping force for corroded tension-control bolts and the effect of each part on force reduction. A finite-element analysis revealed that bolt head section loss, and in particular bolt head diameter reduction, does not reduce the clamping force as much as a decrease in nut width. The root sum square value of the reductions, which is converted into nut width reduction, is proposed as an indicator for estimating the residual clamping force for corroded tension-control bolts. To verify the validity of the proposed method, the residual clamping force of corroded bolts cut from actual steel bridges was measured. The experimental results showed that the accuracy of the proposed method was ±15%.
dc.publisherASCE
dc.titleResidual Clamping Force for Corroded Tension-Control Bolts
dc.typeJournal Paper
dc.journal.volume147
dc.journal.issue3
dc.journal.titleJournal of Structural Engineering
dc.identifier.doi10.1061/(ASCE)ST.1943-541X.0002933
dc.journal.fristpage04020343
dc.journal.lastpage04020343-11
dc.page11
dc.treeJournal of Structural Engineering:;2021:;Volume ( 147 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record