| dc.contributor.author | Allan A. Abwunza | |
| dc.date.accessioned | 2022-01-30T21:58:58Z | |
| dc.date.available | 2022-01-30T21:58:58Z | |
| dc.date.issued | 11/1/2020 12:00:00 AM | |
| dc.identifier.other | %28ASCE%29LA.1943-4170.0000437.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4269061 | |
| dc.publisher | ASCE | |
| dc.title | Closure to “Effectiveness of Arbitration in Contractual Disputes: Tension between Procedural Efficiency and Award Quality” by Allan A. Abwunza, Titus K. Peter, and Kariuki Muigua | |
| dc.type | Journal Paper | |
| dc.journal.volume | 12 | |
| dc.journal.issue | 4 | |
| dc.journal.title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| dc.identifier.doi | 10.1061/(ASCE)LA.1943-4170.0000437 | |
| dc.journal.fristpage | 07020002-1 | |
| dc.journal.lastpage | 07020002-2 | |
| dc.page | 2 | |
| dc.tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2020:;Volume ( 012 ):;issue: 004 | |
| dc.contenttype | Fulltext | |