Show simple item record

dc.contributor.authorArindam Biswas
dc.contributor.authorAnshul Puriya
dc.date.accessioned2022-01-30T21:32:27Z
dc.date.available2022-01-30T21:32:27Z
dc.date.issued3/1/2020 12:00:00 AM
dc.identifier.other%28ASCE%29AE.1943-5568.0000386.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268386
dc.description.abstractRisks to communities arise due to their inability to adapt to the impacts of natural disaster, technological bottleneck, and knowledge and capacity constraints. In this situation it is important to learn from the good cases and enrich knowledge and capacity to build resilience. Post-disaster shelter strategy is an important attribute of resiliency development. Therefore, this paper examines India’s post-disaster shelter strategies by comparing them with equivalent practices in Japan and Indonesia. The objectives of this paper are to review the literature on definitions, challenges, and best practices of post-disaster temporary shelter and temporary housing, to examine the effectiveness of housing recovery through case studies from Japan (2011) and Indonesia (2004) and compare it with the Indian case (2004), and to explore future policy for better practice in Indian post-disaster housing strategies. The paper follows a case study approach for responding to the objectives.
dc.publisherASCE
dc.titleComparative Assessment of Indian Post-Disaster Temporary Housing Strategies
dc.typeJournal Paper
dc.journal.volume26
dc.journal.issue1
dc.journal.titleJournal of Architectural Engineering
dc.identifier.doi10.1061/(ASCE)AE.1943-5568.0000386
dc.page10
dc.treeJournal of Architectural Engineering:;2020:;Volume ( 026 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record