• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    4D-Based Workspace Conflict Detection in Prefabricated Building Constructions

    Thumbnail
    View/Open
    %28ASCE%29CO.1943-7862.0001883.pdf (2.788Mb)
    Date
    9/1/2020 1
    Author
    Hui Ma
    Hongbin Zhang
    Peng Chang
    Metadata
    Show full item record
    Abstract
    A number of parallel lifting operations may take place simultaneously on a prefabricated construction site, likely resulting in workspace overlapping, which is likely to delay the project and even cause accidents. This indicates that the workspace is becoming a deficient resource, which needs to be addressed in project scheduling. To identify the workspace conflict, a 4D conflict detection approach was proposed in this study. First, the allocation of entity space, safety working space, and efficient working space were differentiated based on the characteristics of the prefabricated construction project, followed by analysis of the impacts of three kinds of space interference. Consequently, a workspace generation framework was established that considered both the motion of construction machinery and the requirement of laborers, and then the severity evaluation formula was established accordingly. Based on that, a hybrid axis-aligned bounding box (AABB) and orientational bounding box (OBB) algorithm was proposed to detect workspace conflicts. Finally, workspace conflict detecting and evaluating modules were implemented using Navisworks SDK. Empirical results showed that this algorithm is able to forecast the time–space conflicts accurately for prefabricated construction projects. Benefiting from the framework proposed in this research, project managers can detect workspace conflicts in advance and optimize the schedule to avoid schedule delays and extra cost, as well as to improve safety.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268294
    Collections
    • Journal of Construction Engineering and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV