Show simple item record

dc.contributor.authorJuan Manuel Davila Delgado
dc.contributor.authorLukumon Oyedele
dc.contributor.authorMuhammad Bilal
dc.contributor.authorAnuoluwapo Ajayi
dc.contributor.authorLukman Akanbi
dc.contributor.authorOlugbenga Akinade
dc.date.accessioned2022-01-30T21:28:31Z
dc.date.available2022-01-30T21:28:31Z
dc.date.issued1/1/2020 12:00:00 AM
dc.identifier.other%28ASCE%29CO.1943-7862.0001745.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268266
dc.description.abstractInaccurate cost estimates have significant impacts on the final cost of power transmission projects and erode profits. Methods for cost estimation have been investigated thoroughly, but they are not used widely in practice. The purpose of this study is to leverage a big data architecture, to manage the large and diverse data required for predictive analytics. This paper presents a predictive analytics and modeling system (PAMS) that facilitates the use of different data-driven cost prediction methods. A 2.75-million-point dataset of power transmission projects has been used as a case study. The proposed big data architecture fits this purpose. It can handle the diverse datasets used in the construction sector. The three most prevalent cost estimation models were implemented (linear regression, support vector regression, and artificial neural networks). All models performed better than the estimated human-level performance. The primary contribution of this study to the body of knowledge is an empirical indication that data-driven methods analysed in this study are on average 13.5% better than manual methods for cost estimation of power transmission projects. Additionally, the paper presents a big data architecture that can manage and process large varied datasets and seamless scalability.
dc.publisherASCE
dc.titleBig Data Analytics System for Costing Power Transmission Projects
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue1
dc.journal.titleJournal of Construction Engineering and Management
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0001745
dc.page10
dc.treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record