• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Highway and Transportation Research and Development (English Edition)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Effect of Shield-Tunnel Excavation on Adjacent-Pile Foundation Based on Modified Cam-Clay Model

    Thumbnail
    View/Open
    JHTRCQ.0000733.pdf (5.853Mb)
    Date
    6/1/2020 1
    Author
    Ya-Hui Wei
    Ya-qiong Wang
    Yue Mao
    Long-long Chen
    Meng Wang
    Metadata
    Show full item record
    Abstract
    To ensure the safety of shield tunneling near pile foundation and reduce the disturbance of this phenomenon in an urban metro in the loess area of China, a three-dimensional finite-element analysis model of shield-tunneling construction is established based on ABAQUS numerical simulation software and modified Cam-clay model. The deformation and ground settlement of adjacent-pile foundation during shield tunneling are analyzed. The law of descent is calculated and analyzed. Results show that the influence of tunnel shield on adjacent-pile foundation is primarily manifested in the X-direction displacement of the buried depth of the tunnel. During the shield-excavation process, the X-direction displacement of the pile increases gradually with decreased distance between the excavation face and the pile. When the distance between the pile axis and the excavation face of the tunnel is approximately [−0.5D, +0.5D], the displacement is the largest; when D continues to increase, the X-direction displacement is the largest. The displacement also continues to increase and eventually stabilizes. By obtaining the deformation curve of ground settlement, we find that the ground deformation is the largest above the tunnel axis and gradually decreases to both sides, whereas the pile cap is affected by uneven settlement. In the actual excavation of the tunnel project, strengthening the monitoring of the uneven settlement of the cap is necessary to take timely control measures.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268024
    Collections
    • Journal of Highway and Transportation Research and Development (English Edition)

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV