• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Expected Benefits of Laos’ Hydropower Development Curbed by Hydroclimatic Variability and Limited Transmission Capacity: Opportunities to Reform

    Thumbnail
    View/Open
    %28ASCE%29WR.1943-5452.0001279.pdf (3.932Mb)
    Date
    10/1/2020
    Author
    A. F. M. Kamal Chowdhury
    Thanh Duc Dang
    Arijit Bagchi
    Stefano Galelli
    Metadata
    Show full item record
    Abstract
    Massive investments in hydropower are transforming several river basins across the world—especially in developing countries, where hydroelectricity is often seen as a means to sustain economic growth. While the environmental alterations caused by these projects have been well addressed in the scientific literature, less is known about their actual performance, which could be affected by water availability or the uncoordinated planning of the power generation and transmission facilities. To fill in this gap, we developed a novel water-energy modeling framework that relies on a macroscale semidistributed hydrologic model and a unit commitment model that schedules and dispatches electricity from hydropower reservoirs and other energy sources. The framework is applied to Laos, which has recently attracted large investments in the hydropower sector, making it the so-called Battery of Asia. Simulation results over a 10-year period show that the energy system heavily relies on thermal power during the pre-monsoon months; a condition that is exacerbated by the dry spells caused by El Niño events. During the driest years, the annual generation costs and carbon dioxide emissions could increase by more than 20%. On the other hand, monsoon rainfalls largely increase the available hydropower, whose dispatch is severely limited by the capacity of the high-voltage transmission facilities. In the latter part of the analysis, we discuss the opportunities to improve system performance, and show how the capacity expansion of just a few transmission lines could ease the redistribution of hydroelectricity during peak-production periods.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267914
    Collections
    • Journal of Water Resources Planning and Management

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV