Show simple item record

dc.contributor.authorMarco Ferrante
dc.contributor.authorCamillo Bosco
dc.contributor.authorRita Ugarelli
dc.contributor.authorLorenzo Magenta
dc.contributor.authorTomas Eidsmo
dc.date.accessioned2022-01-30T21:14:08Z
dc.date.available2022-01-30T21:14:08Z
dc.date.issued5/1/2020 12:00:00 AM
dc.identifier.other%28ASCE%29WR.1943-5452.0001201.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267857
dc.description.abstractIn water distribution systems, the substitution of regulating valves by pumps as turbines (PATs) is sustainable if the energy recovery balances the installation and maintenance costs, with a comparable and efficient reduction of the volume lost by leakage. Hence, the installation feasibility and regulation of a PAT require analysis of the introduced effects on the components of the energy, mass, and cost balances. In this paper these effects are explored by means of a case study, i.e., the water distribution system of Trondheim, Norway. Different hydraulic regulations of a PAT are analyzed to maximize the recovered energy, considering the daily variation of the system functioning conditions and the substitution of valves of different kinds, meaning a constant opening degree, a fixed value of pressure at a node of the system, and a control in time of the setting. A feasible solution for the Trondheim network is shown, consisting of the implementation of two twin PATs in parallel with a discontinuous functioning of one of them.
dc.publisherASCE
dc.titleMass, Energy, and Cost Balances in Water Distribution Systems with PATs: The Trondheim Network Case Study
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue5
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0001201
dc.page8
dc.treeJournal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record