Show simple item record

dc.contributor.authorM. Amin Alizadeh-Khameneh
dc.contributor.authorJohan Vium Andersson
dc.date.accessioned2022-01-30T21:10:13Z
dc.date.available2022-01-30T21:10:13Z
dc.date.issued11/1/2020 12:00:00 AM
dc.identifier.other%28ASCE%29SU.1943-5428.0000325.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267765
dc.description.abstractThe design of surveying networks inside tunnels is of crucial importance because an optimal design enables the network to fulfill its required quality parameters, for instance, precision and reliability. The precision of a geodetic network in a tunnel usually decreases drastically as the network expands inside the tunnel and as the distance to known control points increases. The reliability of tunnel geodetic networks is fairly low due to weak network geometry (limited space in the lateral section of the tunnels). This paper studied the uncertainty of tunnel surveying networks using different observation methodologies in the West Link project, in which an 8-km railway tunnel is to be constructed underneath Gothenburg, Sweden. Adding more free station setups and involving observations from the tunnel wall-bracket points can improve the network uncertainty and reliability. Moreover, including orientation measurements (gyro-observations) has a significant effect on preventing a quick decrease of the precision of networks in long corridors.
dc.publisherASCE
dc.titleGeodetic Network Design in Tunnel Surveys
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue4
dc.journal.titleJournal of Surveying Engineering
dc.identifier.doi10.1061/(ASCE)SU.1943-5428.0000325
dc.page11
dc.treeJournal of Surveying Engineering:;2020:;Volume ( 146 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record