• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Pipeline Systems Engineering and Practice
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Comparative Analysis of Environmental and Social Costs of Trenchless Cured-in-Place Pipe Renewal Method with Open-Cut Pipeline Replacement for Sanitary Sewers

    Thumbnail
    View/Open
    %28ASCE%29PS.1949-1204.0000480.pdf (2.129Mb)
    Date
    11/1/2020
    Author
    Vinayak Kaushal
    Mohammad Najafi
    Metadata
    Show full item record
    Abstract
    The development of underground infrastructure, environmental concerns, and economic trends is influencing society, resulting in the advancement of technology for more efficient, environment-friendly, and cost-effective pipeline installation and renewal. A comparison of environmental and social (E and S) costs of a pipeline renewal and replacement (R and R) is an essential element when considering sustainable development of underground infrastructure. Project owners, decision-makers, design consultants, and contractors commonly take into consideration the construction costs only and overlook the E and S cost aspects while making a choice between trenchless renewal and open-cut pipeline replacement (OCPR). Trenchless cured-in-place pipes (CIPP) involve a liquid thermoset resin saturated material that is inserted into the existing pipeline by hydrostatic or air inversion or by mechanically pulling-in and inflating. The liner material is cured-in-place using hot water, steam, or light cured using ultraviolet (UV) light, resulting in the CIPP product. The objective of this paper is to provide a comparative analysis of E and S costs of a trenchless CIPP renewal method (CIPPRM) with OCPR for small diameter sanitary sewers (SDSS) and to identify influencing factors impacting costs. An actual case study based on a river basin in Pasadena, CA, was used for this research to evaluate the E and S costs implication of a small-diameter CIPPRM and OCPR. The results show that the total E and S costs of a trenchless CIPP method is 90% less as compared to OCPR for SDSS, such as 203–305  mm (8–12 in.) diameters. It was determined that the environmental impacts of the CIPP will be more than its social impacts. For open-cut, the social impacts are found to be more than environmental impacts. CIPP renewal caused less ozone depletion, global warming, smog, acidification, eutrophication, noncarcinogenics, respiratory effects, ecotoxicity effects, and fossil fuel depletion. The liner, felt, and resin influenced the environmental cost the most for CIPP compared to open-cut in which power consumption of construction equipment and pipe material drove the environmental cost. The cost of fuel for detour roads, detour delays, and pavement restoration were negligible for CIPPRM as compared with OCPR, which contributed a major social cost factor (approximately 75%). A similar approach can be applied for larger pipe diameters and other locations to develop a decision tool.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4267494
    Collections
    • Journal of Pipeline Systems Engineering and Practice

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV