Show simple item record

dc.contributor.authorJia Liu
dc.contributor.authorYisheng Liu
dc.contributor.authorYing Shi
dc.contributor.authorJian Li
dc.date.accessioned2022-01-30T19:24:28Z
dc.date.available2022-01-30T19:24:28Z
dc.date.issued2020
dc.identifier.other%28ASCE%29CP.1943-5487.0000874.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265245
dc.description.abstractThe resource-constrained project scheduling problem (RCPSP) is an important and challenging problem in the field of construction management. This paper presents a genetic algorithm (GA) for the RCPSP. The proposed algorithm introduces several changes in the genetic algorithm paradigm, such as a new selection operator to select parents to recombine; a modified two-point crossover operator with a specific crossover order; and a linearly decreasing probability-based mutation operator. The proposed algorithm was tested using standard benchmark problems of size J30, J60, and J120 from Project Scheduling Problem Library (PSPLIB) and compared with 19 state-of-the-art metaheuristics in the literature. The computational results validate that the proposed algorithm is a competitive algorithm for solving the RCPSP.
dc.publisherASCE
dc.titleSolving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
dc.typeJournal Paper
dc.journal.volume34
dc.journal.issue2
dc.journal.titleJournal of Computing in Civil Engineering
dc.identifier.doi10.1061/(ASCE)CP.1943-5487.0000874
dc.page04019055
dc.treeJournal of Computing in Civil Engineering:;2020:;Volume ( 034 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record