Show simple item record

dc.contributor.authorBing Zhou
dc.contributor.authorChuan-sheng Wang
dc.contributor.authorFang-liang Liu
dc.contributor.authorEr-jue Wang
dc.date.accessioned2022-01-30T19:11:48Z
dc.date.available2022-01-30T19:11:48Z
dc.date.issued2020
dc.identifier.otherJHTRCQ.0000721.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4264831
dc.description.abstractThe index system and evaluation method of safety assessment in the operation stage are established to realize the safety risk assessment and management in the operation stage of an urban road tunnel. The index scores are obtained from the fuzzy comprehensive evaluation model, and the overall safety risk grade is derived. In view of the index level with an evaluation level greater than or equal to III, special risk assessment is conducted, and safety risk-solving measures are introduced. A corresponding safety risk-management system platform for urban tunnel operation stage is developed on the basis of the results. The results and application of this study have a certain reference value for managing tunnel informatization based on safety risk management.
dc.publisherASCE
dc.titleWhole Risk Assessment System and Management System of Urban Road Tunnel Operation Stage
dc.typeJournal Paper
dc.journal.volume14
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000721
dc.page94-101
dc.treeJournal of Highway and Transportation Research and Development (English Edition):;2020:;Volume ( 014 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record