Show simple item record

dc.contributor.authorJuan Chen
dc.contributor.authorPing-an Zhong
dc.contributor.authorWeiguo Zhang
dc.contributor.authorFeilin Zhu
dc.contributor.authorYu Zhang
dc.date.accessioned2022-01-30T19:07:24Z
dc.date.available2022-01-30T19:07:24Z
dc.date.issued2020
dc.identifier.other%28ASCE%29WR.1943-5452.0001174.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4264689
dc.description.abstractThis paper puts forward an improved risk assessment model for a real-time reservoir flood control operation according to the stochastic differential equation (SDE). The model is composed of three components: (1) uncertainties and risk definition, (2) SDE and reservoir flood routing, (3) and risk calculation. The first component presents the considered uncertainty factors and risks. We consider the following six kinds of uncertainties: forecast errors of reservoir inflows (IFE), reservoir outflow errors (OE), observation errors of a reservoir storage capacity curve (SOE), correlations between IFE, correlations between OE, and correlations between SOE. We consider two kinds of risks: the risk of upstream reservoir flooding at every time moment and the total risk of the flood process. The second component establishes the SDE and then conducts reservoir flood routing and derives stochastic water level errors. The third component derives calculation formulas for the proposed risks. The established model was applied to the Foziling reservoir of China. The results reveal IFE is the critical uncertainty factor, while OE and SOE are both nonnegligible in real-time operation. The risks of the reservoir increase with the uncertainty level of uncertainty factors. However, the correlation coefficient between the stochastic water level errors decreases with an uncertainty level of IFE while it increases with an uncertainty level of OE and SOE. The proposed improved risk assessment model is considered as the risk-informed tool for real-time reservoir operation.
dc.publisherASCE
dc.titleImproved Risk-Assessment Model for Real-Time Reservoir Flood-Control Operation
dc.typeJournal Paper
dc.journal.volume146
dc.journal.issue3
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0001174
dc.page04020007
dc.treeJournal of Water Resources Planning and Management:;2020:;Volume ( 146 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record