Show simple item record

dc.contributor.authorAstolfi, Davide
dc.contributor.authorCastellani, Francesco
dc.contributor.authorFravolini, Mario Luca
dc.contributor.authorCascianelli, Silvia
dc.contributor.authorTerzi, Ludovico
dc.date.accessioned2019-03-17T09:28:16Z
dc.date.available2019-03-17T09:28:16Z
dc.date.copyright1/18/2019 12:00:00 AM
dc.date.issued2019
dc.identifier.issn0195-0738
dc.identifier.otherjert_141_05_051205.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4255514
dc.description.abstractWind turbine upgrades have recently been spreading in the wind energy industry for optimizing the efficiency of the wind kinetic energy conversion. These interventions have material and labor costs; therefore, it is fundamental to estimate the production improvement realistically. Furthermore, the retrofitting of the wind turbines sited in complex environments might exacerbate the stress conditions to which those are subjected and consequently might affect the residual life. In this work, a two-step upgrade on a multimegawatt wind turbine is considered from a wind farm sited in complex terrain. First, vortex generators and passive flow control devices have been installed. Second, the management of the revolutions per minute has been optimized. In this work, a general method is formulated for assessing the wind turbine power upgrades using operational data. The method is based on the study of the residuals between the measured power output and a judicious model of the power output itself, before and after the upgrade. Therefore, properly selecting the model is fundamental. For this reason, an automatic feature selection algorithm is adopted, based on the stepwise multivariate regression. This allows identifying the most meaningful input variables for a multivariate linear model whose target is the power of the upgraded wind turbine. For the test case of interest, the adopted upgrade is estimated to increase the annual energy production to 2.6 ± 0.1%. The aerodynamic and control upgrades are estimated to be 1.8% and 0.8%, respectively, of the production improvement.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titlePrecision Computation of Wind Turbine Power Upgrades: An Aerodynamic and Control Optimization Test Case
dc.typeJournal Paper
dc.journal.volume141
dc.journal.issue5
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.4042450
dc.journal.fristpage51205
dc.journal.lastpage051205-9
dc.treeJournal of Energy Resources Technology:;2019:;volume( 141 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record