Show simple item record

dc.contributor.authorAmin Minaei; Ali Haghighi; Hamid Reza Ghafouri
dc.date.accessioned2019-03-10T11:51:24Z
dc.date.available2019-03-10T11:51:24Z
dc.date.issued2019
dc.identifier.other%28ASCE%29WR.1943-5452.0001070.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254390
dc.description.abstractThis study introduces a decision support system for upgrading aged water distribution mains. The network hydraulics is simulated and evaluated by a hybrid reliability measure, and the design period is divided into multiple upgrade phases. In each phase, a multiobjective optimization problem is solved to derive the trade-off between construction cost and network performance reliability. Subject to budget constraints, upgrade decisions, including those related to pipe replacement and laying parallel pipe, are made, leading to a more robust hydraulic performance of the network over time. To implement multiphase upgrade programs, three approaches are introduced, varying in their assumptions regarding design and construction methods. These approaches are applied to a real case study, and results indicate that the dynamic phase-by-phase design and construction approach is computationally efficient and cost-effective while satisfying physical and performance constraints over the simulation time horizon.
dc.publisherAmerican Society of Civil Engineers
dc.titleComputer-Aided Decision-Making Model for Multiphase Upgrading of Aged Water Distribution Mains
dc.typeJournal Paper
dc.journal.volume145
dc.journal.issue5
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0001070
dc.page04019008
dc.treeJournal of Water Resources Planning and Management:;2019:;Volume ( 145 ):;issue: 005
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record