Show simple item record

dc.contributor.authorKim, Ki-Su
dc.contributor.authorRoh, Myung-Il
dc.contributor.authorLee, Sung-Min
dc.contributor.authorKim, Han-Sung
dc.contributor.authorAhn, Hyunsik
dc.date.accessioned2019-02-28T11:06:03Z
dc.date.available2019-02-28T11:06:03Z
dc.date.copyright10/4/2017 12:00:00 AM
dc.date.issued2018
dc.identifier.issn0892-7219
dc.identifier.otheromae_140_01_014501.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4252679
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleWeight-Estimation Method of FPSO Topsides Considering the Work Breakdown Structure
dc.typeJournal Paper
dc.journal.volume140
dc.journal.issue1
dc.journal.titleJournal of Offshore Mechanics and Arctic Engineering
dc.identifier.doi10.1115/1.4037828
dc.journal.fristpage14501
dc.journal.lastpage014501-10;With the recent international economic downturn, most engineering, procurement, and construction (EPC) contractors are incurring deficits in their floating, production, storage, and offloading unit (FPSO) projects. Numerous reasons underpin thes
dc.treeJournal of Offshore Mechanics and Arctic Engineering:;2018:;volume( 140 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record