Show simple item record

dc.contributor.authorOno, Masato
dc.contributor.authorIigaki, Kazuhiko
dc.contributor.authorSawahata, Hiroaki
dc.contributor.authorShimazaki, Yosuke
dc.contributor.authorShimizu, Atsushi
dc.contributor.authorInoi, Hiroyuki
dc.contributor.authorKondo, Toshinari
dc.contributor.authorKojima, Keidai
dc.contributor.authorTakada, Shoji
dc.contributor.authorSawa, Kazuhiro
dc.date.accessioned2019-02-28T11:05:35Z
dc.date.available2019-02-28T11:05:35Z
dc.date.copyright3/5/2018 12:00:00 AM
dc.date.issued2018
dc.identifier.issn2332-8983
dc.identifier.otherners_004_02_020906.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4252594
dc.description.abstractOn Mar. 11, 2011, the 2011 off the Pacific coast of Tohoku Earthquake of magnitude 9.0 occurred. When the great earthquake occurred, the high temperature engineering test reactor (HTTR) had been stopped under the periodic inspection and maintenance of equipment and instruments. A comprehensive integrity evaluation was carried out for the HTTR facility because the maximum seismic acceleration observed at the HTTR exceeded the maximum value of design basis earthquake. The concept of comprehensive integrity evaluation is divided into two parts. One is the “visual inspection of equipment and instruments.” The other is the “seismic response analysis” for the building structure, equipment and instruments using the observed earthquake. All equipment and instruments related to operation were inspected in the basic inspection. The integrity of the facilities was confirmed by comparing the inspection results or the numerical results with their evaluation criteria. As the results of inspection of equipment and instruments associated with the seismic response analysis, it was judged that there was no problem for operation of the reactor, because there was no damage and performance deterioration. The integrity of HTTR was also supported by the several operations without reactor power in cold conditions of HTTR in 2011, 2013, and 2015. Additionally, the integrity of control rod guide blocks was also confirmed visually when three control rod guide blocks and six replaceable reflector blocks were taken out from reactor core in order to change neutron startup sources in 2015.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleComprehensive Seismic Evaluation of HTTR Against the 2011 Off the Pacific Coast of Tohoku Earthquake
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue2
dc.journal.titleJournal of Nuclear Engineering and Radiation Science
dc.identifier.doi10.1115/1.4039288
dc.journal.fristpage20906
dc.journal.lastpage020906-8
dc.treeJournal of Nuclear Engineering and Radiation Science:;2018:;volume( 004 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record