Show simple item record

dc.contributor.authorHambric, Stephen A.
dc.contributor.authorZiada, Samir
dc.contributor.authorMorante, Richard J.
dc.date.accessioned2019-02-28T11:05:26Z
dc.date.available2019-02-28T11:05:26Z
dc.date.copyright3/5/2018 12:00:00 AM
dc.date.issued2018
dc.identifier.issn2332-8983
dc.identifier.otherners_004_02_021002.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4252567
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleOverview of Boiling Water Reactor Steam Dryer Alternating Stress Assessment Procedures
dc.typeJournal Paper
dc.journal.volume4
dc.journal.issue2
dc.journal.titleJournal of Nuclear Engineering and Radiation Science
dc.identifier.doi10.1115/1.4037898
dc.journal.fristpage21002
dc.journal.lastpage021002-8;The United States Nuclear Regulatory Commission (USNRC) has approved several extended power uprates (EPU) for Boiling Water Reactors (BWRs). In some of the BWRs, operating at the higher EPU power levels and flow rates led to high-cycle fatigue da
dc.treeJournal of Nuclear Engineering and Radiation Science:;2018:;volume( 004 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record