Show simple item record

dc.contributor.authorSingh Nitin Kumar;Kazmi Absar Ahmad
dc.date.accessioned2019-02-26T07:47:27Z
dc.date.available2019-02-26T07:47:27Z
dc.date.issued2018
dc.identifier.other%28ASCE%29WR.1943-5452.0000886.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4249404
dc.description.abstractIn this study, a techno-economic analysis of 16 decentralized wastewater treatment plants (WWTPs) based on various technologies was performed in northern India. Six elements including treatment performance, land use, capital investment, operation and maintenance, cost of treatment, and electricity consumption are discussed in this study. The technologies assessed are extended aeration (EA), moving bed bioreactor (MBBR), sequential bioreactor (SBR), rotating biological contactor (RBC), on-site package (aerobic and/or anaerobic), and membrane bioreactor (MBR). The results indicate that the treatment efficiencies of all cluster-type WWTPs differed significantly from on-site anaerobic package (AnP) types. On the other hand, the treatment efficiencies of on-site aerobic package (AP) systems were reasonably comparable to those of cluster-type plants. The land use for on-site package treatment systems was estimated between .125 and .8  m2 per population equivalent (pe) and higher than for cluster-type WWTPs, which require between .39 and .159  m2/pe. The data collected from this study show that package plant treatment costs are high compared with those of cluster types, ranging from US$.676 to .145 (±1%) and from US$.353 to .1891/m3 (±15−2%), respectively. Cost-benefit analysis (CBA) was undertaken for all the WWTPs and among the considered environmental benefits nitrogen removal contributed to the most. Moreover, the operation of WWTPs was found to be economically viable even without the sale of treated water, except for one AnP plant. For all plants evaluated, specific power consumption (SPC) was found to vary between and 1  kW/m3.
dc.publisherAmerican Society of Civil Engineers
dc.titlePerformance and Cost Analysis of Decentralized Wastewater Treatment Plants in Northern India: Case Study
dc.typeJournal Paper
dc.journal.volume144
dc.journal.issue3
dc.journal.titleJournal of Water Resources Planning and Management
dc.identifier.doi10.1061/(ASCE)WR.1943-5452.0000886
dc.page5017024
dc.treeJournal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record