• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Consequences of Changes to the NRCS Rainfall-Runoff Relations on Hydrologic Design

    Thumbnail
    View/Open
    %28ASCE%29HE.1943-5584.0001681.pdf (1.028Mb)
    Date
    2018
    Author
    Moglen G. E.;McCuen R. H.;Moglen R. L.
    Metadata
    Show full item record
    Abstract
    A proposed quantification of the fundamental concepts in the Natural Resources Conservation Service (NRCS) rainfall-runoff relation is examined to determine changes relevant to peak discharge estimation and drainage design. Changes to the NRCS curve number, storage, and initial abstraction relations result in different estimates of the runoff volume, timing of runoff, and peak discharge produced by long-established empirical equations that quantify event-based runoff. The ratio of existing-to-proposed runoff depth estimates is determined across a range of curve numbers and storm depths. Similarly, the ratio of existing to proposed peak discharge is determined as a function of curve number, storm depth, and design storm within the NRCS TR-55 model. Using an infrastructure design based on the existing equations as the baseline, that infrastructure is underdesigned (overdesigned) if the proposed NRCS equations produce larger (smaller) estimates of volumes or discharges than the existing equations for the same watershed conditions. This study shows that the proposed NRCS equations more likely identify existing infrastructure as being underdesigned for smaller storm events and lower curve numbers. Conditions and design storm produce large variation in the design ratios. Storms with return periods on the order of 2–1 years generally result in peak discharge underdesign ratios that span from 1 to as high as 2 or 3 depending on the watershed conditions, storm size, curve number, and design element in question. Existing infrastructure overdesign is more likely the case when return periods approach 25, 5, or 1 years, with typical overdesign ratios ranging downward from 1. to as small as .8. In most cases, required storage volumes, as prescribed by the NRCS TR-55 approach, are found to be smaller using the proposed equations, leading to both cost savings and reduced pond residence times. Three common design problems are provided only to illustrate typical underdesign and overdesign findings. The central focus is on the potentially negative consequences of proposed changes to a limited aspect of curve number hydrology.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4249029
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV