Show simple item record

dc.contributor.authorGuo Xinlei;Wang Tao;Fu Hui;Guo Yongxin;Li Jiazhen
dc.date.accessioned2019-02-26T07:40:37Z
dc.date.available2019-02-26T07:40:37Z
dc.date.issued2018
dc.identifier.other%28ASCE%29CR.1943-5495.0000168.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248659
dc.description.abstractForecasting of ice jams and their breakup is crucial to prevent or reduce flooding risk in cold regions. A back propagation (BP) neural network model improved by the Levenberg-Marquardt clustering method has been developed with air temperatures and precipitation as inputs and applied for ice-jam forecasting in a given year in the upper reaches of the Heilongjiang River (Amur River), where ice flooding occurs frequently during spring. The accuracy rate achieved was 85%, higher than that obtained using the conventional statistical method (62% accuracy), for ice-jam breakup forecasting. The BP model has a forecast period of 1 days with a maximum error of two days and a qualified rate of 1% for national standards breakup date forecasting. The forecast on the ice-jam breakup, which was released 24 days ahead, provided accurate results for the breakup date and the occurrence of ice jams in the spring of 217.
dc.publisherAmerican Society of Civil Engineers
dc.titleIce-Jam Forecasting during River Breakup Based on Neural Network Theory
dc.typeJournal Paper
dc.journal.volume32
dc.journal.issue3
dc.journal.titleJournal of Cold Regions Engineering
dc.identifier.doi10.1061/(ASCE)CR.1943-5495.0000168
dc.page4018010
dc.treeJournal of Cold Regions Engineering:;2018:;Volume ( 032 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record